Tag Archive for: With

Habs grounds team more efficient with Ventrac

Habs grounds team more efficient with Ventrac: Habs Boys and Habs Girls are two leading independent schools, dating back to 1690, on a fabulous 104 acre, co-educational campus in Hertfordshire.

Mike Kemmett is Head of Grounds & Gardens. He and his team are responsible for maintaining the extensive grounds to a high standard. Football, rugby, lacrosse and cricket, to name a few, all have to have turf playing surfaces maintained.  As with all establishments, however, Mike’s budget needs careful control. In September 2024 Habs was reconsidering its ageing machinery fleet. It was at that time that Mike considered their first Ventrac package from RT Machinery. Versatility and multi-tasking were high on the list of requirements from new machinery and the combination had perform more efficiently than the outgoing fleet. Has the plan worked?

Habs grounds team more efficient with Ventrac

Habs grounds team more efficient with Ventrac

Mike commented that previously Habs had an out-front rider with flail mower for their rough areas, tractors with rear mounted rotaries for quick pitch recovery between games and cylinder mowers for cricket and fine turf maintenance. In fact Mike’s first experience with Ventrac was a demonstration of the 4520 tractor with a Power Rake. “A cricket net area had been let go and needed reclamation. We had concrete rubble, bits of steel and other rubbish, it was a mess” says Mike. “A demo from Ventrac restored it in a few hours to a point where we could replant the area”. Mike also commented that “In addition we saw the stump grinder and trenching attachment, both of which completed tasks that would have taken us much longer to do otherwise. I was impressed”

On the back of these demonstrations Habs purchased a Ventrac 4520, MU720 Finishing Mower, an HQ682 Rough Cut Mower and a KM500 Fore-end Loader, knowing that other accessories could be purchased or hired in future. Mike likes the one power unit, many attachments concept. One immediate advantage being it saves space in his barn. Another advantage is “One operator can swap from one attachment to another in minutes” says Mike. “The Tough Cut mower has cleared woodlands that haven’t been touched in years, we even cut twelve foot bamboo down. It was an old assault course we will now use for something else.”

The Wide Area Mower allows Mike and his team to repair divots and pitch damage even in winter. “We’re predominantly clay. Our pitches take a punishing sometimes” said Mike. “The rear roller stripes the pitches nicely and makes the pitch safer even if the pitches are over used during events like rugby sevens”. With their old fleet of tractors and mowers they would not have got onto the pitches so play would be cancelled or held elsewhere. Mike has found that the compactness, low ground pressure and articulated steering of the Ventrac allows him to turn faster at the end of each run on a pitch without turf damage. “A job that took three and half hours now takes two and half” commented Mike, a 28% improvement in efficiency.

Habs continues to expand its horizons and is introducing new facilities, planning for the future. The versatility of more than thirty two attachments will ensure the Ventracs indispensability in helping to maintain the campus to the high standard that is expected. The plan is working.

For the latest industry news visit turfmatters.co.uk/news

Get all of the big headlines, pictures, opinions and videos on stories that matter to you.

Follow us on Twitter and Instagram for fun, fresh and engaging content.

You can also find us on Facebook for more of your must-see news, features, videos and pictures from Turf Matters.

Efficiency meets durability with GKB Sandspreader

Efficiency meets durability with GKB Sandspreader: Maintaining top-tier playing conditions at North London’s Stanmore Golf Club is a constant balancing act – particularly with the ever-changing challenges posed by the climate.

After 31 years at the club, Course Manager Barry Neville know what it takes to keep the course in shape, which begins with the right machinery to deliver both efficiency and outstanding results. With a new SP100 from GKB Machines, the team now have a robust, versatile topdressing solution to support ongoing course renovation and drainage works.

Efficiency meets durability with GKB Sandspreader

Efficiency meets durability with GKB Sandspreader

Set on challenging London clay, the course — originally an inland links — has evolved into a mature parkland layout, now grappling like most with more prolonged periods of rainfall and the need for drainage improvements. Together with seeking to improve efficiency of routine topdressing, Barry explains that this multi-year programme drove the demand for a new, reliable solution. “Our previous dresser had served us well for close to two decades so the process of finding its replacement wasn’t taken lightly. We looked at a good few options, but the GKB Sandspreader really stood out. Seeing it at BTME 2025 then again at the Doe Show, the build quality was apparent immediately” he says.

“Not only could you tell the steel construction was robust, we also liked the fact the Sandspreader uses hydraulic controls rather than electric. A lot of modern kit is becoming more complex which is fine when it works, but in the real world with the weather and conditions in which we operate, things eventually go wrong” Barry says.

The SP100 was delivered by dealers Ernest Doe in June 2025 once the machine had been fully equipped to meet the club’s unique requirements. “Filling the trenches after the installation of the new drainage has been a labour-intensive task, with a lot of barrowing, tipping and backfilling by hand. This is manageable on greens but for fairways and larger areas, it just wasn’t efficient” he explains. “The ability to swap out the spinning discs of the SP100 for a cross conveyor has proved to be a gamechanger.”

Together with transforming the task of topping up trenches, the SP100 has also been impressing with the routine topdressing around the course. “We’ve dressed the greens twice with it and it’s gone faultlessly. If we get out first thing in the morning, the job is done by 9:00am and within a couple of hours the light dressing is brushed in so the golfers hardly even notice.”

“In addition, we’ve been using the conveyor system to top up bunkers which is already presenting a major time saving.”

Looking ahead, Barry foresees the versatility of the Sandspreader will pay dividends across the course. “Together with routine topdressing every couple of weeks, we’ll be looking to put 100 tonnes of material through it during our maintenance week in August. With the hopper slightly larger than our previous machine, we also have the potential to dress our fairways in the future. It’s a futureproofed purchase.”

For the latest industry news visit turfmatters.co.uk/news

Get all of the big headlines, pictures, opinions and videos on stories that matter to you.

Follow us on Twitter and Instagram for fun, fresh and engaging content.

You can also find us on Facebook for more of your must-see news, features, videos and pictures from Turf Matters.

Dunstall Park Teams Up With STRI Group

Dunstall Park Teams Up With STRI Group: The team that supports the Wimbledon Championships’ world-famous lawn tennis courts has been appointed to oversee the development of the UK’s first greyhound racing track in a decade.

Based in Yorkshire but operating internationally, STRI Group specialises in the design construction and management of natural turf and artificial sports surfaces with more than 96 years’ experience.

Dunstall Park Teams Up With STRI Group

Dunstall Park Teams Up With STRI Group

Its team still contributes to the management of Wimbledon’s grass courts, with other projects including the most recent FIFA World Cup in Qatar, the 2022 Commonwealth Games and 2012 London Olympics.

Now, the group will help construct the UK’s newest greyhound racing track at Dunstall Park in Wolverhampton in partnership with Arena Racing Company.

The new track is being developed using the latest welfare driven evidence and sustainability practices ahead of a planned autumn launch. It will feature 75-metre straights, with a bend radius of 47-metres and width of 5.6 metres and sit inside the venue’s horse racing track in full view of its 25,000 capacity grandstand.

Dr Christian Spring, STRI Group Principal Scientist, joined in 2005 and has been working closely with the greyhound racing industry for seven years.

“Our understanding of greyhound racing tracks and how they can operate to the best of their ability on a consistent level has shifted significantly in recent years,” said Dr Spring.

“We factor in all aspects when striving to deliver the highest quality welfare driven racing surfaces, from weather patterns to bend widths and radius plus camber and the sand we use.

“Dunstall Park will deliver the blueprint for an optimal greyhound racing surface designed to host several weekly fixtures under the widest possible range of conditions.”

Once open, Dunstall Park will host four weekly fixtures and operate as one of five greyhound stadia under the management of Arena Racing Company – the UK’s largest racecourse operator.

As part of ARC’s existing partnership with STRI Group, Dunstall Park’s grounds team will work closely with Dr Spring and his team to ensure year-round best practice is applied using the latest evidence-driven track maintenance guidance.

The new track will also be capable of recycling 700,000 litres of water through a purpose-built attenuation tank which will capture disused water and rainfall to minimise the impact on the environment.

Dr Spring added: “Greyhound racing stadiums were typically built decades ago when weather patterns we experience were very different and more seasonal.

“We’re far more susceptible to prolonged periods of wet and dry weather, as this year has proven. It’s prompted everyone to consider how we source water when preparing tracks for racing so stadiums can be resilient to the weather.

“It might sound basic, but the attenuation tank has been designed using cutting-edge technology so water loss to evaporation and soil absorption is minimised and provides the grounds team with enough water to operate for days, enhancing the tracks water resilience.

“We’re turning a pipe dream into reality, and it’s an exciting project for the team to help deliver.”

An opening date for Dunstall Park Greyhound Stadium will be confirmed in the coming weeks.

The track will host its first major competition on Friday, October 24, with the 93rd renewal of the £20,000 Premier Greyhound Racing Oaks. To celebrate the track’s first Category One final, free admission will be available to all racegoers.

Additional information will be released nearer the time.

For the latest industry news visit turfmatters.co.uk/news

Get all of the big headlines, pictures, opinions and videos on stories that matter to you.

Follow us on Twitter and Instagram for fun, fresh and engaging content.

You can also find us on Facebook for more of your must-see news, features, videos and pictures from Turf Matters.

Minimise emissions and maximise uptime with the ZE range

Minimise emissions and maximise uptime with the ZE range: The ZE Electric Zero-Turn range from Kubota has proven its credentials with operators looking to reduce their environmental footprint, all without detriment to productivity or cut performance.

Verifying that sustainability does not have to result in a compromise in turfcare standards, the fully-electric ZE-421 and ZE-481 mowers from Kubota’s Zero Turn collection are exceeding expectations too on operator comfort – reducing the noise, odours and vibrations associated with ICE-powered equipment.

Minimise emissions and maximise uptime with the ZE range

Minimise emissions and maximise uptime with the ZE range

With no internal combustion engine, the ZE produces no CO2 or particulates during operation, supporting the UK air quality and net-zero commitments of local authorities and other green space managers. Instead, the ZE range is powered by a durable 48V, 10kWh lithium-ion battery which allows the mower to cover up to 15,000m2 on a single charge. Depending on site conditions, the operator can choose between Eco, Standard or Boost mode deck settings to further optimise battery life whilst choosing between two transport speeds, when exhausted, the battery module can be removed and exchanged in minutes.

The advanced K-Sense auto-adjustment system also actively monitors deck load in real time to automatically balance mowing and travel speed to preserve cut quality on varying grass types and densities.

The ZE-421 and ZE-481 models come with a 42” or 48” side-discharge deck, ideal for professional contractors and landscaping applications, with an optional mulching kit available. Smooth and quiet in operation, additional comfort is provided by the adjustable seat and ergonomic deck controls designed to reduce fatigue and improve operator wellbeing.

In addition, the ongoing maintenance of the ZE range is significantly simplified, making it ideal for busy grounds teams. With no engine oil, spark plugs, fuel filters or exhaust systems to service, the routine upkeep is reduced to essential checks such as blade sharpening, tyre inspection and periodic battery monitoring. The electric drivetrain also results in fewer moving parts and less wear and tear, lowering the risk of breakdowns and maximising uptime.

The ZE range forms part of Kubota’s ongoing declaration to support a carbon neutral environment by 2050. For more details on other sustainable solutions for professional groundcare, visit www.kubota-eu.com

For the latest industry news visit turfmatters.co.uk/news

Get all of the big headlines, pictures, opinions and videos on stories that matter to you.

Follow us on Twitter and Instagram for fun, fresh and engaging content.

You can also find us on Facebook for more of your must-see news, features, videos and pictures from Turf Matters.

Maximise uptime with Toro’s MVP kits

Maximise uptime with Toro’s MVP kits: Minimising downtime is something turfcare professionals actively guard against – and rightly so – but how much is maximising uptime considered? With Toro there are numerous ways to do this – and a small way that can make a significant difference. 

Maintenance, value, performance – the three top priorities for turfcare professionals all wrapped up in one time-saving, budget-stretching package. Toro MVP kits provide all the parts for over 100 different maintenance issues in one box, helping to maximise uptime in multiple ways.

Maximise uptime with Toro's MVP kits

Maximise uptime with Toro’s MVP kits

Lasts longer

They are the same MVP kits everyone is used to with one significant difference – now the contents can cover longer hours, starting at 400 hours with some covering up to 1000.

Savings on individual parts costs

Not only are these maintenance parts competitively priced, but the total cost of each kit is significantly less than what it would be to purchase each part separately.

Streamline the process to save time

Toro understands that maintenance teams and workshop managers have lots of tasks to prioritise and these kits take several steps out of the process. With the maintenance task list listed on the box, it’s easy to stay on track and eliminate the guesswork.

Make planning easy

Why complicate maintenance? These kits bring peace of mind that the workshop is fully stocked all the time. They eliminate the need for much of the workshop planning and streamline the shopping list – and now there’s no need to look up the individual parts numbers!

Guarantee factory line specifications

MVP kits are designed to make it easier for technicians to maintain Toro equipment to factory specifications – every part fits perfectly and everyone can rely on the fact that the equipment is always properly maintained.

No downtime, only uptime

There’s no need to worry about missing that vital part right when it is needed and putting a hold on the machine incurring lost hours. Pretty much every eventuality is covered Toro’s MVP kits from rebuilding rollers and replacing hydraulic hoses to overhauling cutting units – making sure that no matter what the issue uptime is maximised and the machine keeps up with the turf’s demands.

Michael Hampton, Purchasing and Sales Process Manager at UK Toro distributor Reesink Turfcare, says: “It’s important for a machine’s performance and longevity that genuine parts are used with the exact engineering specifications for the machine. By choosing Toro MVP kits customers can be sure they get the best performance now with fewer problems down the line, all at the best possible price.”

Contact a local dealer to take advantage of Toro’s MVP kits, visit reesinkturfcare.co.uk or call 01480 226800.

For the latest industry news visit turfmatters.co.uk/news

Get all of the big headlines, pictures, opinions and videos on stories that matter to you.

Follow us on Twitter and Instagram for fun, fresh and engaging content.

You can also find us on Facebook for more of your must-see news, features, videos and pictures from Turf Matters.